We a good story
Quick delivery in the UK

Signal Failure

- London to Birmingham, HS2 on Foot

About Signal Failure

One November morning, Tom Jeffreys set off from Euston Station with a gnarled old walking stick in his hand and an overloaded rucksack. His aim was to walk the 119 miles from London to Birmingham along the proposed route of HS2. Needless to say, he failed.

Show more
  • Language:
  • English
  • ISBN:
  • 9781910312148
  • Binding:
  • Paperback
  • Pages:
  • 416
  • Published:
  • April 12, 2017
  • Dimensions:
  • 198x131x30 mm.
  • Weight:
  • 388 g.
Delivery: 2-4 weeks
Expected delivery: August 25, 2025

Description of Signal Failure

One November morning, Tom Jeffreys set off from Euston Station with a gnarled old walking stick in his hand and an overloaded rucksack. His aim was to walk the 119 miles from London to Birmingham along the proposed route of HS2. Needless to say, he failed.

User ratings of Signal Failure



Join thousands of book lovers

Sign up to our newsletter and receive discounts and inspiration for your next reading experience.